Back to all guides

Small carpentry

Caulk gaps between baseboards and walls

A gap at the top of baseboard is a caulk job only after the board is tight to the wall. A loose board should be fastened into the studs first. The separate guide for that is the one to follow if the board springs back.

Difficulty 1 of 5 · About 25 min

Tools needed

Materials

Steps

  1. Press the board. If it moves, fasten it into the studs before you caulk.

  2. Remove loose old caulk.

  3. Run a thin bead along the top edge and tool it with a damp finger.

  4. Paint the bead when it is dry, if the wall paint needs to cover it.

Safety notes

Rather have us do it? Book Fixer's Repair Service